MTA, Arts for Transit Commission, The Process...


Vast, Coming to Fruition...








This has been a three-year process. Mostly the time frame is due to the renovations being done on the station, the art is secondary.

To the left is called a cartoon. The glass fabricator creates this to indicate where the glass will be cut. After my original designs were accepted by the MTA, I then lay them out to fit the panels that will be installed at the station. The Fabricator takes it from there. First a sample is made from a design I send to the fabricator, which had elements from the three pieces.


On the top is one of the completed panels. There are five panels to each of the three artworks, making 15 panels in total. It is faceted glass embedded in epoxy, making it a very tough material, perfect for people height art.

I am hoping to have a platform party sometime in the end of November, but the platform is still under constrution (but still open), so the North side is not installed as of yet. I found a great bar down the road to warm up in afterwards, hope it's not mid-January!